Geotechnical Leading Indicator · Control Room

602 inspections · 40 KPIs · 2025-12-162026-05-26

Connecting…Green ≥ 95%Amber 85–95%Red < 85%Critical exposureChart Builder →
Overall compliance
All inspections · 2025-12-162026-05-26
Monitor
89.4%
1231 failed of 11665 checks
Workplaces
321
Open actions
1231
Forecast next
11.1%
Critical non-compliance
801
751 past SLA
Immediate action
High-hazard overdue
743
Hazard weight 3 · past due
Most deteriorating
Support Design
Δ -2.3pp · 30d vs prior
Most repeated fail
41 workplaces
Are all the excavations, including bullnoses, supported to s…
Forecast risk
11.1%
Next period · α=0.4 + trend
Inspections
602
40 KPIs tracked

Compliance trend

Weekly compliance with RAG thresholds · 4-wk and 12-wk rolling averages

Failure-rate forecast

Next 4 weeks · exponential smoothing + linear trend

Control chart · weekly failure rate

±2σ statistical control limits · breaches highlighted

Leading indicator scorecards

One card per subtask · weighted by hazard rating · 12-week sparkline

Waiting place to Development End
88%
Weight ×2·277 fails· 0.3pp
Preconditioning
99%
Weight ×2·1 fails· 0.0pp
Mine Design
93%
Weight ×2·132 fails· 0.9pp
Support Design
89%
Weight ×3·777 fails· 2.3pp
Face Support
91%
Weight ×3·15 fails· 2.3pp
Geology
48%
Weight ×2·29 fails· 0.8pp

Risk heat map · top 14 workplaces × subtask

Cell colour = subtask compliance · sorted by weighted risk

Workplace
Waiting → End
Preconditioning
Mine Design
Support Design
Face Support
Geology
Risk
100 3W CUT 4 HWR 05N67%100%66%83
100 3W CUT 4 HWR 02W72%90%59%80
100 04W CUT 03 HWR 06EC65%87%75%50%74
100 04W CUT 06 SAD 04W92%100%85%93%100%50%49
100 04W CUT 06 SAD 01W90%100%73%96%50%46
100 2AW CUT 5 MAD 6E75%100%80%83%44
100 2BW CUT 5 MAD 6S73%92%73%71%44
100 3W CUT 5 SAD 01E79%100%76%42
100 04W CUT 04 ACC/ACF 03E77%100%73%42
100 3W CUT 8 CRW 01E71%100%78%41
100 04W CUT 06 SAD 06W90%100%87%94%100%50%41
100 04W CUT 05 ACF 01S79%80%74%40
90 1BW CUT1 ACC 3W83%78%90%40
100 04W CUT 06 SAD 03W87%100%88%89%39

Pareto · top failing KPIs

80/20 — bars = failures · line = cumulative %

Failures by leading indicator · weekly

Stacked weekly failure count by subtask

Open corrective-action aging

Open vs overdue by age bucket · critical KPIs use 7-day SLA

Compliance by section

Click a section to drill into its workplaces · RAG against 95% / 85% thresholds

SectionComplianceAuditsFailuresWorkplacesRiskTrend
582.7%11238866RED Stable
788.1%11125333AMBER Improving
Section 290.2%7716344AMBER Improving
890.3%6011133AMBER Declining
Section 392.1%669737AMBER Declining
692.2%486330AMBER Improving
492.4%7611152AMBER Improving
NMD95.5%524529GREEN Declining

Failures by workplace

Bars coloured by RAG · click a bar to drill into the workplace

Green ≥ 95% Amber 85–95% Red < 85%

KPI-level analysis

Failure rate · repeat workplaces · 30d trend · weighted risk

KPISubtaskFailsRateRepeats30d ΔRisk
!Has all significantly damaged and/or corroded support units been replaced?
Support Design19444.2%38+12.3pp582
!Is the sidewall support vetical distance to footwall to standard?
Support Design18934.3%35+13.3pp567
Are all the excavations, including bullnoses, supported to standard?
Waiting place to Development End21436.5%41-5.6pp428
!Is the last line of secondary support within standard distance from the end face?
Support Design13131.5%29-11.7pp393
!Has the end been supported within 48 hours?
Support Design5643.4%13+31.4pp168
Is the excavation width to standard?
Mine Design8214.1%17-0.5pp164
!Is the last line of primary support within standard distance from the end face?
Support Design529.0%8-0.7pp156
!Have long anchors been installed at intersections?
Support Design376.5%5-0.9pp111
Is the excavation height to standard?
Mine Design437.3%8+2.8pp86
!Is the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)
Support Design233.9%3+3.8pp69
!Is the spacing between long anchors to standard?
Support Design234.4%5-0.6pp69
!Is the installation quality of long anchors to standard?
Support Design234.3%3-0.4pp69
Is the latest Rock Engineering and Seismic Rating reports displayed on the notice board?
Waiting place to Development End326.4%7+4.9pp64
!Are the face, hangingwall and sidewalls watered down and barred solid?
Support Design203.8%3+5.2pp60
Are all breakaways supported as per the mine standard?
Waiting place to Development End254.5%4-1.3pp50
Are all faults demarcated?
Geology2496.0%50.0pp48
!Has the face been supported within 48 hours?
Face Support1230.0%1-41.7pp36
!Have long anchors been installed at planned breakaway and/or planned holing positions?
Support Design113.9%0-7.6pp33
!Is the spacing between tendons to standard?
Support Design81.4%1+4.8pp24
!Is shotcrete applied to the correct thickness and area (primary support)?
Support Design84.2%2+4.1pp24
!Have uninspected and/or unsupported areas been barricaded off?
Waiting place to Development End61.0%10.0pp12
!Is additional face support units installed where excavation dimensions exceed standard?
Face Support318.8%0+100.0pp9
Are the leads/lags between ends within standard?
Mine Design44.2%10.0pp8
!No overhanging face condition observed?
Mine Design30.5%0-0.1pp6
Are all faults supported to standard?
Geology27.7%0-22.2pp4
Are all brows demarcated?
Geology2100.0%10.0pp4
!Is the correct type of support being installed?
Support Design10.2%0-0.9pp3
!Is the installation quality of tendons to standard?
Support Design10.2%00.0pp3
Are the number of preconditioning holes to standard?
Preconditioning15.3%00.0pp2
Are all brows supported to mine standard?
Geology133.3%0+50.0pp2
Is the positioning of preconditioning holes to standard?
Preconditioning00.0%00.0pp0
Is the drilling angle of preconditioning holes to standard?
Preconditioning00.0%00.0pp0
Is there any evidence of prior preconditioning?
Preconditioning00.0%00.0pp0
Are the end sidewalls fractured and scaling?
Mine Design00.0%00.0pp0
!Is the correct type of face support installed?
Face Support00.0%00.0pp0
!Is the spacing between face support tendons to standard?
Face Support00.0%00.0pp0
!Is the installation quality of tendons to standard? (i.e. Installation angle, not protruding more than 0.3m)
Face Support00.0%00.0pp0
!Is the installation quality of face mesh to standard? (i.e. orientation, 300mm overlap)
Face Support00.0%00.0pp0
Are all the dykes demarcated?
Geology00.0%00.0pp0
Are all the dykes supported to standard?
Geology00.0%00.0pp0

Immediate focus required

Workplaces with multiple high-hazard or repeat failures (last 30 days)

  • 100 2BW CUT 5 MAD 5S
    Last inspection 2026-05-18
    7 critical
    Waiting place to Development EndSupport Design
    9 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 2BW CUT 3 ACC 03W
    Last inspection 2026-05-26
    7 critical
    Support Design
    7 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 04W CUT 04 ACC/ACF 03E
    Last inspection 2026-05-18
    6 critical
    Support DesignWaiting place to Development End
    7 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 04W CUT 04 ACF 08W
    Last inspection 2026-05-18
    6 critical
    Support Design
    6 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 2BW CUT 5 MAD 6S
    Last inspection 2026-05-05
    5 critical
    Waiting place to Development EndSupport DesignFace Support
    6 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 04W CUT 03 HWR 06EC
    Last inspection 2026-05-18
    4 critical
    Waiting place to Development EndSupport DesignGeology
    8 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 04W CUT 05 ACC/ACF 04S
    Last inspection 2026-05-07
    4 critical
    Waiting place to Development EndSupport Design
    7 failures · escalate to Operations Manager · re-inspect within 24h before next blast.
  • 100 2BW CUT 5 MAD 7S
    Last inspection 2026-05-18
    4 critical
    Waiting place to Development EndSupport DesignFace Support
    6 failures · escalate to Operations Manager · re-inspect within 24h before next blast.

Corrective actions · drill-through

1231 open actions · sorted by priority (hazard × overdue × critical)

StatusRefWorkplaceSubtaskFailed KPISuggested actionOwnerDueAge
Critical OverdueSEC3-EWPA-26-01100 1BW CUT2 MAD 2E2Support DesignAre the face, hangingwall and sidewalls watered down and barred solid?Mesh to be installed as per standard. Complete bullnose support. Baring to be done as per standard.K. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-01100 1BW CUT2 MAD 2E2Support DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Mesh to be installed as per standard. Complete bullnose support. Baring to be done as per standard.K. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-02100 1BW CUT4 ACC 3NSupport DesignAre the face, hangingwall and sidewalls watered down and barred solid?Baredown loose rocks to solid before installing supportK. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-03100 1BW CUT6 CRR 2ESupport DesignAre the face, hangingwall and sidewalls watered down and barred solid?Bare down loose rocks to solid ground before installing support. Reduce the excavation width on the next coming blast—complete bullnose support.K. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-04100 1BW CUT6 ACC 2WSupport DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Correct the overlap of the mesh when installing support to be 300mmK. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-05100 1BW CUT7 ACC 1SSupport DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Correct the overlap of the mesh when installing support to be 300mmK. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-05100 1BW CUT7 ACC 1SSupport DesignHas all significantly damaged and/or corroded support units been replaced?Correct the overlap of the mesh when installing support to be 300mmK. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-06100 1BW CUT7 ACC 2SSupport DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Install 1 mesh to cover the open gap at the entrance of the face/ end.K. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-07100 1BW CUT6 ACC 1WSupport DesignAre the face, hangingwall and sidewalls watered down and barred solid?Support the bullnose as per standard. Barig to be done as per standard. Ensure mesh overlaps by 300mmK. Phuduhudu2025-12-23161d
Critical OverdueSEC3-EWPA-26-07100 1BW CUT6 ACC 1WSupport DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Support the bullnose as per standard. Barig to be done as per standard. Ensure mesh overlaps by 300mmK. Phuduhudu2025-12-23161d
Critical OverdueDEV-EWPA-26-0190 1AW CUT 1 ACC 6NSupport DesignIs the sidewall support vetical distance to footwall to standard?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Replace damaged support on the sidewall. Replace corroded mesh on the H/W at the entrance to the end. Fix mesh overlap on the sidewall. Rectify support distance t…M. Kheswa2026-01-10143d
Critical OverdueDEV-EWPA-26-0190 1AW CUT 1 ACC 6NSupport DesignIs the spacing between long anchors to standard?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Replace damaged support on the sidewall. Replace corroded mesh on the H/W at the entrance to the end. Fix mesh overlap on the sidewall. Rectify support distance t…M. Kheswa2026-01-10143d
Critical OverdueDEV-EWPA-26-0190 1AW CUT 1 ACC 6NSupport DesignHas all significantly damaged and/or corroded support units been replaced?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Replace damaged support on the sidewall. Replace corroded mesh on the H/W at the entrance to the end. Fix mesh overlap on the sidewall. Rectify support distance t…M. Kheswa2026-01-10143d
Critical OverdueDEV-EWPA-26-0390 1BW CUT 1 ACC 3W 1Support DesignIs the sidewall support vetical distance to footwall to standard?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Complete rehab on the support on the route to the development end, emphasis on the entrance directly from the ramp. Install one more line of anchors on the inters…K. Phuduhudu2026-01-10143d
Critical OverdueDEV-EWPA-26-0390 1BW CUT 1 ACC 3W 1Support DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Complete rehab on the support on the route to the development end, emphasis on the entrance directly from the ramp. Install one more line of anchors on the inters…K. Phuduhudu2026-01-10143d
Critical OverdueDEV-EWPA-26-0390 1BW CUT 1 ACC 3W 1Support DesignHave long anchors been installed at intersections?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Complete rehab on the support on the route to the development end, emphasis on the entrance directly from the ramp. Install one more line of anchors on the inters…K. Phuduhudu2026-01-10143d
Critical OverdueDEV-EWPA-26-0590 1BW CUT 1 ACC 5WSupport DesignIs the last line of primary support within standard distance from the end face?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Install primary support. All Hangingwall sliping to be done from a safe distance under supported rockmass. Complete rehab on the support on the route to the devel…L. Zondo2026-01-10143d
Critical OverdueDEV-EWPA-26-0695 1W CUT 3 ACC 9WSupport DesignHas all significantly damaged and/or corroded support units been replaced?TYPE 1 SUPPORT REQUIRED WITH ANCHORS. Start with anchors at the exposed intersection. Ensure that mesh at the brow area is fully pinned with bolts. Keep anchors at 10m to the face before the blast.L. Zondo2026-01-10143d
Critical OverdueNMD-EWPA-26-01105LVL NMD LAT 04W 100LSupport DesignIs the installation quality of long anchors to standard?One missing anchor and one not tensioned to the rock-wall on the hanging wall at intersection owing to the fractured rock on the hanging wall. Bleed the fractured rock on the hanging wall at the inter…M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-02105 LVL NMD MCB 04WSupport DesignHas all significantly damaged and/or corroded support units been replaced?Rehabilitate damaged bullnose support.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-03105 LVL NMD XCT 01S C4WSupport DesignIs the installation quality of long anchors to standard?Anchors can not be installed because of the fractured rocks bulging in mesh on the hanging wall. Bleed the bulging hanging wall near roan dyke and re-support.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-03105 LVL NMD XCT 01S C4WSupport DesignHas all significantly damaged and/or corroded support units been replaced?Anchors can not be installed because of the fractured rocks bulging in mesh on the hanging wall. Bleed the bulging hanging wall near roan dyke and re-support.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-04105 LVL NMD XCT 01S C2WSupport DesignIs the last line of secondary support within standard distance from the end face?Secondary support distance to the face is greater than 20m. Support the holing of 105 LVL NMD XCT 00 2WBAC.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-04105 LVL NMD XCT 01S C2WSupport DesignHas all significantly damaged and/or corroded support units been replaced?Secondary support distance to the face is greater than 20m. Support the holing of 105 LVL NMD XCT 00 2WBAC.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-05105 LVL NMD LAT 01E 2WSupport DesignIs the installation quality of mesh to standard? (i.e. orientation, 300mm overlap)Pin loose mesh with tendon support.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-07105 LVL NMD HLG 03S SOW Support DesignIs the last line of secondary support within standard distance from the end face?Cable anchor on the sidewall not tensioned to the rockwall. Install secondary on all the created gaps.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-07105 LVL NMD HLG 03S SOW Support DesignIs the installation quality of long anchors to standard?Cable anchor on the sidewall not tensioned to the rockwall. Install secondary on all the created gaps.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-08105 LVL NMD HLG 02S SOW Support DesignIs the installation quality of long anchors to standard?Fix all outstanding secondary support at the back area.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-10105 LVL NMD HLG 01S SOWSupport DesignIs the sidewall support vetical distance to footwall to standard?Primary support distance to the footwall is greater than 0.8m on the western sidewall. Secondary support distance to the face is greater the 20m.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-10105 LVL NMD HLG 01S SOWSupport DesignIs the last line of secondary support within standard distance from the end face?Primary support distance to the footwall is greater than 0.8m on the western sidewall. Secondary support distance to the face is greater the 20m.M. Kheswa2026-01-10143d
Critical OverdueNMD-EWPA-26-11105 LVL NMD HLG 01N SOWSupport DesignIs the last line of secondary support within standard distance from the end face?Secondary support distance to the face is greater the 20m.M. Kheswa2026-01-10143d
Critical OverdueDEV-CWPA4-26-01100 3W CUT 4 ACF 05ESupport DesignAre the face, hangingwall and sidewalls watered down and barred solid?Ensure to fully support the excavation and bar down all the loose rocks on the hangingwall and sidewall| Ensure to support the weathered layered rockmass on the sidewall| Install intersection support …M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-01100 3W CUT 4 ACF 05ESupport DesignIs the last line of primary support within standard distance from the end face?Ensure to fully support the excavation and bar down all the loose rocks on the hangingwall and sidewall| Ensure to support the weathered layered rockmass on the sidewall| Install intersection support …M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-01100 3W CUT 4 ACF 05ESupport DesignIs the sidewall support vetical distance to footwall to standard?Ensure to fully support the excavation and bar down all the loose rocks on the hangingwall and sidewall| Ensure to support the weathered layered rockmass on the sidewall| Install intersection support …M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-01100 3W CUT 4 ACF 05ESupport DesignHave long anchors been installed at intersections?Ensure to fully support the excavation and bar down all the loose rocks on the hangingwall and sidewall| Ensure to support the weathered layered rockmass on the sidewall| Install intersection support …M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-02100 3W CUT 4 HWR 02WSupport DesignIs the last line of primary support within standard distance from the end face?ENnsure to fully support the brow created adjacent to ACF 05E| Extend the long anchors to the face position| Ensure to install sidewall support starting from ACf 05E to the current face positions| Lay…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-02100 3W CUT 4 HWR 02WSupport DesignIs the sidewall support vetical distance to footwall to standard?ENnsure to fully support the brow created adjacent to ACF 05E| Extend the long anchors to the face position| Ensure to install sidewall support starting from ACf 05E to the current face positions| Lay…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-02100 3W CUT 4 HWR 02WSupport DesignIs the last line of secondary support within standard distance from the end face?ENnsure to fully support the brow created adjacent to ACF 05E| Extend the long anchors to the face position| Ensure to install sidewall support starting from ACf 05E to the current face positions| Lay…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-02100 3W CUT 4 HWR 02WSupport DesignHave long anchors been installed at intersections?ENnsure to fully support the brow created adjacent to ACF 05E| Extend the long anchors to the face position| Ensure to install sidewall support starting from ACf 05E to the current face positions| Lay…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-03100 3W CUT 4 HWR 05NSupport DesignIs the spacing between tendons to standard?Ensure to extend 4.3m long anchors towards the current face postion| BAr down the loose rocks and support the excavation fully of MAD 4E from HWR 05N| M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-03100 3W CUT 4 HWR 05NSupport DesignIs the last line of secondary support within standard distance from the end face?Ensure to extend 4.3m long anchors towards the current face postion| BAr down the loose rocks and support the excavation fully of MAD 4E from HWR 05N| M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-03100 3W CUT 4 HWR 05NSupport DesignHave long anchors been installed at intersections?Ensure to extend 4.3m long anchors towards the current face postion| BAr down the loose rocks and support the excavation fully of MAD 4E from HWR 05N| M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-04100 3W CUT 6 CRW 01NSupport DesignIs the sidewall support vetical distance to footwall to standard?Ensure to extend the follow-on long anchors to the current face position| Extend sidewall support to 0.8m vertical distance to footwall. M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-04100 3W CUT 6 CRW 01NSupport DesignIs the last line of secondary support within standard distance from the end face?Ensure to extend the follow-on long anchors to the current face position| Extend sidewall support to 0.8m vertical distance to footwall. M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-05100 3W CUT 7 CRW 01WSupport DesignHas all significantly damaged and/or corroded support units been replaced?Ensure to rehabilitate the areal support on the hanging wall entrance of the excavation which has exposed loose rocks| ensure the excavation is shotcreted| Rehab the damaged bullnose support| M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-06100 3W CUT 7 CRW 01SSupport DesignIs the last line of secondary support within standard distance from the end face?Sagging damaged support along the intersection of CRW 01E| Water percolation along CUT 8 CRW 01E corroding the support system| Follow-on long anchors lagging more than 20m| Ensure to gradually increas…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-07100 3W CUT 8 CRW 01ESupport DesignIs the last line of primary support within standard distance from the end face?Ensure to rehabilitate southern side bullnose| Last blast not supported| Waterpercolation on the southern shoulder of teh excavation corrodinig the system- spray shotcrete| Inadequate intersection sup…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-07100 3W CUT 8 CRW 01ESupport DesignIs the spacing between long anchors to standard?Ensure to rehabilitate southern side bullnose| Last blast not supported| Waterpercolation on the southern shoulder of teh excavation corrodinig the system- spray shotcrete| Inadequate intersection sup…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-07100 3W CUT 8 CRW 01ESupport DesignHas all significantly damaged and/or corroded support units been replaced?Ensure to rehabilitate southern side bullnose| Last blast not supported| Waterpercolation on the southern shoulder of teh excavation corrodinig the system- spray shotcrete| Inadequate intersection sup…M.Hadebe2026-01-13140d
Critical OverdueDEV-CWPA4-26-08100 2BW CUT05 ACC 04WSupport DesignHas all significantly damaged and/or corroded support units been replaced?Ensure to rehabilitate sidewall support| MM.Sibiya2026-01-13140d
Critical OverdueDEV-CWPA4-26-09100 2AW CUT06 CRR 02SSupport DesignHas all significantly damaged and/or corroded support units been replaced?Ensure to rehabilitate bullnose support| MM.Sibiya2026-01-13140d
Critical OverdueDEV-CWPA4-26-10100 2AW CUT07 CRR 01SSupport DesignHas all significantly damaged and/or corroded support units been replaced?Ensure to rehabilitate sidewall support| MM.Sibiya2026-01-13140d
Critical OverdueDEV-CWPA4-26-11100 2AW CUT07 CRR 03SSupport DesignHas all significantly damaged and/or corroded support units been replaced?Ensure to rehabilitate sidewall support| MM.Sibiya2026-01-13140d
Critical OverdueDEV-EWPA-26-0795 1W CUT 3 ACC 3N1Support DesignIs the sidewall support vetical distance to footwall to standard?TYPE 1 SUPPORT REQUIRED WITH ANCHORS.Replace all damaged support on the route to the developmen end, and on the end's sidewall. Keep support distance to footwall at 0.8m. Keep anchors at 10m to the fa…L. Zondo2026-01-14139d
Critical OverdueDEV-EWPA-26-0795 1W CUT 3 ACC 3N1Support DesignHas all significantly damaged and/or corroded support units been replaced?TYPE 1 SUPPORT REQUIRED WITH ANCHORS.Replace all damaged support on the route to the developmen end, and on the end's sidewall. Keep support distance to footwall at 0.8m. Keep anchors at 10m to the fa…L. Zondo2026-01-14139d
Critical OverdueSEC3-EWPA-26-08100 1BW CUT2 MAD 2E Support DesignIs the sidewall support vetical distance to footwall to standard?Type 3 support required. Reduce excavation height. Keep support distance to footwall at a maximum of 0.3m. Replace damaged sidewall and bullnose support. End mining in high stress, mine with pre-condi…L.Zondo2026-01-14139d
Critical OverdueSEC3-EWPA-26-08100 1BW CUT2 MAD 2E Support DesignHas all significantly damaged and/or corroded support units been replaced?Type 3 support required. Reduce excavation height. Keep support distance to footwall at a maximum of 0.3m. Replace damaged sidewall and bullnose support. End mining in high stress, mine with pre-condi…L.Zondo2026-01-14139d
Critical OverdueDEV-WWPA-26-07100 04W CUT 07 CRW 01S BTMSupport DesignIs the sidewall support vetical distance to footwall to standard?Ensure that the end is blasted to the correct height.| Ensure that the sidewall support extends to 0.8m to footwall.| Ensure that follow-on 4.3m long anchors do not exceed 10.0m to to face prior to bl…A. Sewcharan2026-01-15138d
Critical OverdueDEV-WWPA-26-07100 04W CUT 07 CRW 01S BTMSupport DesignIs the last line of secondary support within standard distance from the end face?Ensure that the end is blasted to the correct height.| Ensure that the sidewall support extends to 0.8m to footwall.| Ensure that follow-on 4.3m long anchors do not exceed 10.0m to to face prior to bl…A. Sewcharan2026-01-15138d
Critical OverdueDEV-WWPA-26-09100 04W CUT 08 CRW 03S SILO Support DesignIs the sidewall support vetical distance to footwall to standard?Ensure that the sidewall support is extended to 0.8m to the footwall along the entire length of the excavation. A. Sewcharan2026-01-15138d

Methodology & rules

RAG thresholds
Green ≥ 95% · Amber 85–95% · Red < 85%. Critical = Support Design / Face Support / 48-hour support / barricading / overhanging face.
Weighted risk index
Risk = Σ (failures × hazard weight). Support Design ×3, Face Support ×3, others ×2.
Forecast
Exponential smoothing (α = 0.4) on weekly failure rate plus linear trend on the last 6 smoothed points, projected 4 weeks.
Control limits
UCL/LCL set at ±2σ of weekly failure rate. Any week above UCL triggers "abnormal deterioration".
Escalation rules
Immediate action: any failed Critical KPI. Escalate to management: same KPI failing in ≥ 2 inspections at a workplace. Critical exposure: ≥ 2 critical failures in a workplace within 30 days.
Action priority
Priority = hazard × 10 + overdue days + 20 if critical. SLA: critical KPIs 7 days · others 14 days.